FALCON USER’S GUIDE is provided throughout the transportation activity. Once at the launch vehicle integration hangar, the encapsulated assembly is rotated to horizontal and mated with the launch vehicle already positioned on its transporter-erector. Figure 8-5: Payload encapsulation and integration sequence Once the encapsulated assembly is mated to the launch vehicle, the hangar facility HVAC system is connected via a fairing air conditioning duct to maintain environmental control inside the fairing. The payload is then reconnected to electrical ground support equipment (if required) and electrical interfaces are verified. At this point, the integrated launch vehicle is ready for rollout and launch (Figure 8-6). Figure 8-6: Integrated Falcon 9 on the transporter-erector within the integration hangar and rolling out © Space Exploration Technologies Corp. All rights reserved. 56
SPACEX FALCON USER’S GUIDE Page 59 Page 61