FALCON USER’S GUIDE CCAFS VAFB Overhead crane Quantity 2 2 Hook height 18 m (59 ft) 18.3 m (60 ft) Capacity Crane 1: 27,215 kg (30 ton) North Crane: 27,215 kg (30 T) Crane 2: 13,607 kg (15 ton) South Crane: 18,143 kg (20 T) both certified for hypergolic lifting Hoist Speed (min/max) 6.1 cm/609 min 6.1 cm/609 min (0.2 ft /20 min), per crane (0.2 ft/20 min), per crane Operation modes Independent Independent or synchronized Access equipment 45-ft boom lifts, pallet jack, lifting Pallet jack, lifting hardware, ladders, hardware, ladders, movable platforms movable platforms Electrical 60 Hz AC 120 V 1-phase, 120/208 V 3-phase, and 120 V 1-phase and 120/208 V 3-phase 480 V 3-phase service service 50 Hz AC 220/380V – WYE, 3-Phase, 5-Wire with 220/380V- WYE, 3-Phase, 4-Wire with UPS back up UPS backup Grounding Per MIL-STD-1542 Per MIL-STD-1542 GN supply 2 Quality MIL-PRF-27401, Grade B MIL-PRF-27401, Grade B Pressure 34,473 kPa (5,000 psi) 34,473 kPa (5,000 psi) 3 3 Flow rate 1699.2 Nm /hr (1,000 scfm) 1699.2 Nm /hr (1,000 scfm) Helium supply Quality MIL-PRF-27407, Grade A MIL-PRF-27407B, Type 1, Grade B Pressure 39,300 kPa (5,700 psi) 41,368 kPa (6,000 psi) 3 3 Flow rate 1699.2 Nm /hr (1,000 scfm) 1699.2 Nm /hr(1,000 scfm) Compressed air supply Pressure 758 kPa (110 psi) 862 kPa (125 psi) Communications Administrative phone VOIP phones VOIP phones Paging system Yes Yes Area warning system Yes Yes Security Locking facility Yes Yes Launch site badges Yes Yes Video monitoring Yes Yes As an alternative nonstandard service, SpaceX can arrange the use of commercial processing facilities near CCAFS or VAFB for payload processing. If a payload is processed at a facility other than the SpaceX-provided payload processing facility, SpaceX can provide environmentally controlled transportation from that facility to the launch vehicle integration hangar. JOINT OPERATIONS AND INTEGRATION Joint operations begin ten days before launch. Payload attachment to the payload attach fitting and fairing encapsulation are performed by SpaceX within the payload processing facility (Figure 8-5). Fairing encapsulation is performed in the vertical orientation. Transportation is performed in the vertical orientation, and environmental control © Space Exploration Technologies Corp. All rights reserved. 55
SPACEX FALCON USER’S GUIDE Page 58 Page 60